Pathfinder Dining Hall Projects

Program Studies
Completed Projects
DescriptionBenef. Occup.
Dining Hall Renovations05.2017
Alterations for Safety08.1997
Refurbish Dining Hall Chiller06.1996
Repair Emergency Lighting08.1992
Replace Roof08.1992
Install Electric & Steam Meters04.1992
Replace Roof06.1991
Furnish/Install Hot Water Boilers12.1989
Develop ECM01.1988
Alter/Improve Ventilation10.1987
Replace Temperature Controllers06.1986
Repair/Replace Roof02.1986
Energy Conservation Study10.1985
Repair Tunnel Leaks09.1985
Install Fire Suppression System03.1985
Repair Absorption Chillers03.1984
Conversion of Basement09.1980
Install Basement Windows08.1980
Final Contract Payment08.1980
Replace Hot Water Heater09.1977
Correct Tunnel Leaks09.1975
Construct Dining Hall09.1967