| Description | Benef. Occup. |
| Dining Hall Renovations | 05.2017 |
| Alterations for Safety | 08.1997 |
| Refurbish Dining Hall Chiller | 06.1996 |
| Repair Emergency Lighting | 08.1992 |
| Replace Roof | 08.1992 |
| Install Electric & Steam Meters | 04.1992 |
| Replace Roof | 06.1991 |
| Furnish/Install Hot Water Boilers | 12.1989 |
| Develop ECM | 01.1988 |
| Alter/Improve Ventilation | 10.1987 |
| Replace Temperature Controllers | 06.1986 |
| Repair/Replace Roof | 02.1986 |
| Energy Conservation Study | 10.1985 |
| Repair Tunnel Leaks | 09.1985 |
| Install Fire Suppression System | 03.1985 |
| Repair Absorption Chillers | 03.1984 |
| Conversion of Basement | 09.1980 |
| Install Basement Windows | 08.1980 |
| Final Contract Payment | 08.1980 |
| Replace Hot Water Heater | 09.1977 |
| Correct Tunnel Leaks | 09.1975 |
| Construct Dining Hall | 09.1967 |