DescriptionBenef. Occup.
Program Study for Intramural & Recreation04.2017
Remove Fuel Tank02.2017
Install Dance Floor - Room 30011.2016
Mechanical Upgrades01.2009
Swetman/Poucher Surge Space01.2006
Small Boiler for Lakefront Buildings10.2003
Asbestos Abatement/Replace Condensation Tanks & Piping08.1998
Replace Water Treatment Equipment02.1997
Repair Breeching 08.1996
Rehab Steam Traps04.1995
Replace Burners/Combustion Controls04.1995
Emergency Repairs to Boiler Stack/Breeching10.1994
Replace Roof09.1994
Replace Fans03.1992
Replace Ballasts in Fluorescent Fixtures05.1991
Alterations for Safety06.1989
Develop ECM 01.1988
Replace Caulking07.1987
Install New Temperature Controls for Fan07.1986
Replace Boiler04.1986
Replace Boiler Insulation03.1986
Repair/Replace HVAC Heating Coils02.1986
Replace Smoke Indicators & Boilers03.1985
Replace Air Compressor/Install Batteries11.1984
Repair Insulation/Covering on Breeching 11.1984
Install New Fireproof Suspended Ceilings06.1980
Replace Combustion Controls04.1980
Air Pollution Control03.1978
Install New Boiler Casings07.1975
Replace Boiler Tubes11.1972
Rehab Boiler Room10.1970
Addition to Heating Plant11.1965
Construct Heating Plant/Athletic Hall09.1958