Current Projects
| Description | Benef. Occup. |
| Asbestos Abatement | 04.2017 |
| Program Study for Intercollegiate Athletics | 04.2017 |
| FFE Study Laker/Athletics | 04.2017 |
| Laker Hall Exterior Rehab for Critical Maintenance | 02.2017 |
| Laker Hall Pool - Mechanical & Plumbing Rehabilitation | 11.2014 |
| Laker Hall Pool - Mechanical Upgrades | 01.2009 |
| Replace Campus Fire Alarm System | 06.2001 |
| Replace PCB Transformers | 10.1999 |
| Replace Bleachers/Refinish Flooring | 01.1999 |
| Rehabilitation of Locker Room | 03.1998 |
| Rehab Pool Mechanical Equipment | 06.1997 |
| Improve Existing Handicapped Doors/Ramps | 01.1996 |
| Abate Asbestos | 12.1995 |
| Abate Lower Machine Room Asbestos | 10.1995 |
| Rehabilitate Steam Traps | 04.1995 |
| Replace Exterior Doors | 06.1994 |
| Replace Condensate/Feed Water Receiver | 02.1993 |
| Replace Roof | 08.1992 |
| Install Energy Efficient Lights Aux Gym | 12.1989 |
| Alterations for Safety - Phase V | 06.1989 |
| Air Monitoring of Asbestos Project | 05.1989 |
| Develop ECM | 01.1988 |
| Repair Bleacher Operating Mechanism | 01.1988 |
| Replace Boiler | 10.1987 |
| Seal Stairs to Basement | 06.1987 |
| Provide Halide Lighting Fixtures | 02.1987 |
| Asbestos Containment | 12.1986 |
| Replace Gymnasium Lighting Fixtures | 06.1986 |
| Energy Conservation Study - Cycle VI | 10.1985 |
| Repair One Bleacher Operating Mechanism | 06.1985 |
| Replace Underwater Lights | 11.1984 |
| Provide Energy - Efficient Air Dampers | 07.1984 |
| Recaulk Wall Panels | 12.1981 |
| Energy Conservation Measures | 09.1981 |
| Recoat Roof | 12.1979 |
| Install Turbulators in Boiler #1 | 12.1976 |
| Repairs to Power Operated Bleachers | 07.1974 |
| Mens Health and Physical Education | 08.1968 |