DescriptionBenef. Occup.
Asbestos Abatement04.2017
Program Study for Intercollegiate Athletics04.2017
FFE Study Laker/Athletics04.2017
Laker Hall Exterior Rehab for Critical Maintenance02.2017
Laker Hall Pool - Mechanical & Plumbing Rehabilitation11.2014
Laker Hall Pool - Mechanical Upgrades01.2009
Replace Campus Fire Alarm System06.2001
Replace PCB Transformers10.1999
Replace Bleachers/Refinish Flooring 01.1999
Rehabilitation of Locker Room03.1998
Rehab Pool Mechanical Equipment06.1997
Improve Existing Handicapped Doors/Ramps01.1996
Abate Asbestos 12.1995
Abate Lower Machine Room Asbestos10.1995
Rehabilitate Steam Traps04.1995
Replace Exterior Doors06.1994
Replace Condensate/Feed Water Receiver02.1993
Replace Roof 08.1992
Install Energy Efficient Lights Aux Gym12.1989
Alterations for Safety - Phase V06.1989
Air Monitoring of Asbestos Project05.1989
Develop ECM 01.1988
Repair Bleacher Operating Mechanism01.1988
Replace Boiler10.1987
Seal Stairs to Basement 06.1987
Provide Halide Lighting Fixtures02.1987
Asbestos Containment12.1986
Replace Gymnasium Lighting Fixtures06.1986
Energy Conservation Study - Cycle VI10.1985
Repair One Bleacher Operating Mechanism06.1985
Replace Underwater Lights11.1984
Provide Energy - Efficient Air Dampers07.1984
Recaulk Wall Panels12.1981
Energy Conservation Measures09.1981
Recoat Roof12.1979
Install Turbulators in Boiler #112.1976
Repairs to Power Operated Bleachers07.1974
Mens Health and Physical Education08.1968